Reporting
window

Top critical issues — composite criticality score TWIN

Ranked by composite criticality — click a row for Asset 360°, sort any column, search or filter
All Crit High Med
Asset Zone Customers Score Severity

Resumen General — service by region DERIVED · Cognos

Full-utility rollup · 1.33M client accounts · 112 filtration plants
RegionPlantsIn service% service

Avoided-cost model TWIN

Benefit of acting = reduction in outage + emergency-response + non-revenue-water cost vs. deferral
Deferral exposure (open orders)
Avoided 5-yr cost (portfolio)
Outage cost run-rate
Non-revenue-water (modeled)$1.9M / yr
Blended benefit-cost ratio

Budget vs. value ($M) FY2026

Capital + operating resilience program
committed headroom / $24.5M
LineCostAvoided 5-yr

Predicted failures — next 30 days watsonx.ai

Trend-extrapolated from the operational twin — cumulative lifeline-asset failures, surfaced ahead of service loss
Asset Health Pred. fail Cause Age open

Generator readiness gap EGU

713 power facilities · readiness drives outage exposure in grid events
92.6%
Operable
53
Not operable
31
Pending repair
22
Pending replace
OperablePending repairPending replace

Investment & expenditure priorities — ranked by BCR TWIN

Prioritized portfolio · benefit-cost ratio = avoided cost ÷ remediation · fund from remaining FY budget
Check items to fund — committed, headroom & blended BCR recompute live; click a row for Asset 360°
AssetCustomersTotal costAvoided 5-yrBCREst. payback

FY2026 budget execution

committed YTD FY budget headroom
Selected portfolio · items
Total cost
CAPEX / OPEX /
Blended BCR

Parts & inventory — 30-day projection Materials

Maintenance-parts demand & reorder exposure (mission c)
30-day parts cost$146k
Lines below reorder point5
Stockout risk (≤2 on hand)3
Critical partOn-handStatus

DRRS Operations Assistant RAG

Grounded answers over governed PRASA sources · incident corpus, procedures, SAP-PM work orders
⛨ Grounded (RAG)No external egressPII maskedAudit logged

Capabilities & connected sources

Capabilities

  • Grounded (RAG) answers over the governed PRASA corpus
  • Composite-criticality ranking & downstream impact
  • Drafts budget requests & SAP-PM work orders (human-approved)

Connected sources

Grounded in PRASA dataYes
External egressNone
PII handlingMasked
Audit logCaptured
Governed by watsonx.governance · on-premises · no write-back except the human-approved SAP work order via watsonx.orchestrate.

Purpose

This briefing accompanies the PRASA Use Case Request to IBM. It demonstrates, in navigable form, the executive results of replacing the incumbent Foundry-based DRRS on an IBM read-only analytics stack — extended with failure prediction and parts/inventory-cost projection.

Modules demonstrated

  • Executive Command — Resumen General regional rollup & composite-criticality situation
  • Financial & decision — avoided-cost, BCR, FY budget execution
  • Asset health & predicted failure — watsonx.ai, ahead of service loss (absent in the incumbent)
  • Generator readiness & parts/inventory projection
  • DRRS Operations Assistant — grounded, governed RAG

Evidence basis

Operational findings derive from the PRASA incident corpus (~96,650 records) and DRRS workspace exports; the Resumen General is the derived (Cognos) report layer. The operational KPIs here are computed live on a 39-node San-Juan twin sample that mirrors the production ontology.

Verification path

  • Incumbent contract values — PR Office of the Comptroller contract registry
  • Budget figures — PRASA approved FY2026 capital & operating budget and execution records
  • Costs — Independent Cost Estimate (ICE) and the IBM priced response

Framework alignment

Centralized real-time twin · predictive maintenance · geospatial + multi-signal fusion · human-validated repair orders prioritized by projected cost-of-deferral · AI for failure prediction.

Integrity notice. This is a consultant-produced interactive mock-up illustrating the requested target state of the IBM solution; it is not a production system. Operational values are from a representative twin sample.
Design-stage · structure mirrors the PRASA DRRS study mock-up, re-skinned in the project design system. Operational KPIs from the 39-node twin sample; Resumen General / generators / parts from the study datasets (derived report layer).